7 m wide, 80m long passage, with a bridge connecting Lošinj Channel and the harbour bay. The bride opens at 09 h in the morning and 18h in the evening.
Details
Depth:2.5 - 10 m
Max height:1.8 m
Max beam:7 m
Safety
Approach
houses on the SE shore of the passage and boatyard cranes S of the bridge
Comments (0)
To be able to write comment on POI you have to be registered user of mySea.
Comments (0)