City port of Crikvenica. Few berths for guest are available. Gas station can be reached in 2 minutes. Good protection at Bura and Jugo (northeast to southeast), not recommended for winds from the west. In December 2021 the reconstructions at the port of Crikvenica were completed. A 130 m long breakwater was built and the pier was extended by 50 m. Bollards and mooring eyes are integrated into the promenade. All berth have water and electricity.
The new offer is available to locals and guests alike.
Details
Depth:0.5 - 4 m
Facilities
Boat lift
Fuel station
Safety
Wind protection:
Swells from:
Safety note
-mind the shallows marked by two lit posts NW of the main breakwater -watch out for shallows marked by cardinal marker ESE of the breakwater
Comments (0)